Cerro do Lobo Reservoir
Teixeira Duarte - Engenharia e Construções, S.A.
The Cerro do Lobo Hill reservoir is constituted by a rockfill embankment soil, divided into two wings composed of the main element and gate, with recessed membrane.
The materials used in its construction are divided into five zones (A;B;C;D;E) with maximum dimensions of 76,1mm; 300mm; 600mm; 300mm and 800mm. The total volume is about 400 thousand m³.
Type:
Infrastructure, Urban Hydraulic
Country:
Portugal
Location:
Beja
Start date:
2013
Final date:
2014